Our proudest, finest work

Filter case studies by:

Tyne Yard HOOB

Brief Description

CML were contracted to design and construct a new High Output Operations Base (HOOB) for the High Output train. Working closely with Network Rail and the end user of the depot, we developed a detailed specification for the facility, consisting of pway works, M&E upgrades, installation of new modular…

Womersley Road Footbridge

Brief Description

WAG1/46 Womersley Road Footbridge is a single span structure located close to the level crossing on Womersley Road in Knottingley. It crosses the Wakefield to Goole Railway line at mileage 59m 0550yds and facilitates a pedestrian access route across the railway, principally when the footpath on the adjacent level crossing…

Underbridge 30, NYMR

Brief Description

CML were contracted by North Yorkshire Moors Railway (NYMR), to undertake the reconstruction of ‘Scales Bridge’ at Darnholme, Nth Yorkshire. NYMR is a heritage railway operating from Whitby to Pickering.

Brigg Station Footbridge

Brief Description

MAC3/243 Brigg Station Footbridge is a single span structure at Brigg Railway Station. It crosses the Cleethorpes to Nunnery Main Line Junction via Retford Railway line at mileage 91m 0066yds and facilitates a pedestrian route across the railway linking the two platforms. An assessment of the capacity of the footbridge carried…

York train station

Brief Description

The contract was to improve the condition of the roof structure of the main concourse and train sheds at York station, including a new glazing system. This was a challenging project to deliver whilst maintaining the operational running of a high profile station 24/7.

Cudworth Bypass Underbridge

Brief Description

Cudworth & West Green bypass has been constructed between Fishdam Lane in Carlton and Shafton in Barnsley to relieve the volume of traffic through the village of Cudworth. The route of this bypass intersects the Monk Bretton Up and Down line which consists of an unelectrified single track constructed on…