Our proudest, finest work

Filter case studies by:

Goosehill Bridge

Brief Description

Replacement of MVN/252 Goosehill Bridge single span bridleway/footway/cycle path bridge on the MVN2 line at Goosehill, West Yorkshire.

Duckcote Lane Footbridge

Brief Description

LBE1/19A is a single span simply supported footbridge carrying a footpath over the Leeds Bradford railway, contracted to CML for re-construction.

Sleaford Station Footbridge

Brief Description

Sleaford Station Footbridge is a single span Grade II listed structure, providing a vital pedestrian link between the Up (North) and Down (South) platforms over the twin tracks of the Barkston South Junction to Skegness line.

Handsworth Cutting

Brief Description

Handsworth cutting on the Deepcar to Cleethorpes line is cut through coal measures with bands of sandstone and siltstone/mudstone. The local geology has weathered leading to unstable cutting slopes with a history of rockfalls in the cutting, most notably one causing the derailment of a train in 1996 on the…

The Soft Option

Brief Description

CML has over 30 years experience in designing and installing 'soft option' scour protection. This approach is the perfect low impact solution for environmentally sensitive sites.

England Lane Footbridge

Brief Description

WAG1/45 England Lane Footbridge is a single span structure located close to the level crossing on England Lane in Knottingley. It crosses the Wakefield to Goole Railway line at mileage 59m 0110yds and facilitates a pedestrian route across the railway, principally when the footpath on the adjacent level crossing is…

1 2 3 5